Image for Planning & Control Using Primavera P6 Version 7 : For All Industries Including Versions 4 to 7

Planning & Control Using Primavera P6 Version 7 : For All Industries Including Versions 4 to 7

See all formats and editions

A user guide and training manual written for Project Management Professionals who wish to learn how to plan and control projects in an established Primavera Enterprise environment with or without Resources and Roles.

This book is an update of the Primavera P6 Version 7 book published in 2010 and has revised workshops and a new Earned Value chapter.

The book is packed with screen shots, constructive tips and contains workshops with solutions at the end of each chapter for the reader to practice the skills taught.

It has been written so it may be used with the EPPM Web tool.

The book is aimed at: - People who wish learn the software but are unable to attend a training course and find the software reference manual hard going. - Project management companies who wish to run their own software training courses or provide their employees with an alternative text to the vendor supplied user manual. - Training organizations requiring a training manual to run their own training courses.

This book is a PMI Approved course and instructors PowerPoint slide shows are available to training organizations.

PMI REPs may apply to have this course licensed to them and award 21 PDUs to each attendee. Primavera Systems Inc. originally asked the author to write this book and this publication is ideal for people who would like to gain an understanding of how the software operates up to an intermediate level.

It covers Primavera Versions from 3.5 to 7 and it explains some of the differences from SureTrak, P3, Microsoft Project and Asta Powerproject to assist people converting form other products.

The book is designed to teach planners and schedulers in any industry how to setup and use the software in a project environment.

It explains in plain English and in a logical sequence, the steps required to create and maintain an unresourced and resourced schedule.

It tackles some of the more complex aspects of the software that the user manual does not address.

It highlights the sources of information and the methods that should be employed to produce a realistic and useful project schedule. The book provides advice on how on how the many software options may be applied to projects environments and it aims to teach readers how to plan and control projects created within the software package and stays focused on explaining how to use Primavera to schedule projects by: - Concentrating on the core functions required to set up an enterprise environment and how to plan and control projects. - Providing command lists at the start of each chapter as a quick reference. - Providing a comprehensive table of contents and index of all topics.

The book is intended to be used: - As a self teach book, or - A user guide, or - A training manual for a two day training course.

This book is written by an experienced scheduler, who has used the software at the sharp end of projects and is not a techo.

It draws on the author's practical experience in using the software in a wide variety of industries.

It presents workable solutions to real day to day planning and scheduling problems and contains practical advice on how to set up the software and import data.

Read More
Available
£50.00
Add Line Customisation
Out of print
Add to List
Product Details
Eastwood Harris Pty Ltd
1921059753 / 9781921059759
Spiral bound
21/02/2013
Australia
390 pages
210 x 297 mm, 1200 grams
Professional & Vocational Learn More