The Hanford Nuclear Reservation in Washington state, which produced plutonium for nuclear weapons from 1944-1987, is the site of the largest and most complex nuclear cleanup challenge in the United States.

The U.S. Department of Energy's Office of Environmental Management (DOE-EM) is responsible for managing the cleanup of the radioactive and other hazardous wastes stored in 177 underground tanks at the site.

DOE plans to use vitrification, or immobilization in glass waste forms, for all of the high-level radioactive waste at Hanford.

However, because the volume of "low-activity waste" exceeds DOEs capacity limits for vitrification, DOE must decide how to treat the remaining "supplemental low-activity waste" (SLAW) so that it can be safely disposed in a near-surface disposal site.

To help inform its decision, DOE contracted with a Federally Funded Research and Development Center (FFRDC), led by Savannah River National Laboratory, to analyze and report its findings about three potential alternative technologies. At the request of Congress, the National Academies reviewed the FFRDC report in terms of its value for decision making and how well it meets various Congressional requirements related to Hanford cleanup.

The review concludes that the FFRDC report is overall very strong, provides a useful framework for evaluating the technology options, and is responsive to guidance from the first National Academies review.

The framework provides for structured side-by-side comparisons, using relevant criteria, of a limited number of alternatives for managing SLAW.

Recommendations for strengthening the report include estimating a lifecycle cost profile for constructing and operating each alternative, and providing more in-depth discussion on potential challenges that may need to be addressed in obtaining the necessary various regulatory approvals. Table of ContentsFront MatterSummary1 Context and Setting2 The Committee's Technical Review of the FFRDC's Complete DraftReport3 The Committee's Observations Concerning the FFRDC's Draft ReportReferencesAppendix A: Section 3125 of Fiscal Year 2021 National DefenseAuthorization Act and Section 3134 of the Fiscal Year 2017 NationalDefense Authorization ActAppendix B: Statement of TaskAppendix C: Presentations at the Committee's Information-GatheringMeetings and List and Summary of Comments Received During thePublic Comment PeriodAppendix D: Acronyms and AbbreviationsAppendix E: Biographical Sketches of the Committee, TechnicalConsultant, and Study Director

Read More
Available
£18.99
Add Line Customisation
Usually dispatched within 4 weeks
Add to List
Product Details
National Academies Press
0309690838 / 9780309690836
Paperback / softback
30/01/2023
United States
76 pages
216 x 279 mm
Professional & Vocational Learn More